Construction underway at Pineview Reservoir to fix old Ogden drinking water pipeline
Construction has begun at Pineview Reservoir to replace an aging drinking water pipeline serving Ogden, dropping reservoir levels to about 2% capacity while a $100 million project proceeds; the crossing phase is expected to finish by January 2027.
Read the full story at fox13now.com
Also covered by ABC 4, Fox 13 (YouTube) and KSL News (YouTube)
This is a summary with a link to the original. The reporting belongs to Fox 13.
