Utah Relay
KSL

Biotower project proceeds on Salt Lake's west side

A biotower sewer-gas filtration project on Salt Lake City's west side is progressing after crews reduced its planned height from 30 to 15 feet and made design changes in response to neighborhood concerns; completion expected by late February.

Read the full story at ksl.com

Also covered by KSL News (YouTube)

Share X Facebook LinkedIn Bluesky Email

This is a summary with a link to the original. The reporting belongs to KSL.